The Swift Package Index logo.Swift Package Index

Has it really been five years since Swift Package Index launched? Read our anniversary blog post!

Build Information

Failed to build Dated, reference v0.1.6 (70f0cd), with Swift 6.2 (beta) for Wasm on 24 Jul 2025 12:25:46 UTC.

Build Command

bash -c docker run --pull=always --rm -v "checkouts-4606859-2":/host -w "$PWD" registry.gitlab.com/finestructure/spi-images:wasm-6.2-latest swift build --swift-sdk wasm32-unknown-wasi 2>&1

Build Log

========================================
RunAll
========================================
Builder version: 4.64.0
Interrupt handler set up.
========================================
Checkout
========================================
Clone URL: https://github.com/Semantical/Dated.git
Reference: v0.1.6
Initialized empty Git repository in /host/spi-builder-workspace/.git/
hint: Using 'master' as the name for the initial branch. This default branch name
hint: is subject to change. To configure the initial branch name to use in all
hint: of your new repositories, which will suppress this warning, call:
hint:
hint: 	git config --global init.defaultBranch <name>
hint:
hint: Names commonly chosen instead of 'master' are 'main', 'trunk' and
hint: 'development'. The just-created branch can be renamed via this command:
hint:
hint: 	git branch -m <name>
From https://github.com/Semantical/Dated
 * tag               v0.1.6     -> FETCH_HEAD
HEAD is now at 70f0cde feat: add formatting of days relative to others
Cloned https://github.com/Semantical/Dated.git
Revision (git rev-parse @):
70f0cde62f0be369a416d964228b36167e3b8971
SPI manifest file found: $PWD/.spi.yml
SUCCESS checkout https://github.com/Semantical/Dated.git at v0.1.6
========================================
Build
========================================
Selected platform:         wasm
Swift version:             6.2
Building package at path:  $PWD
https://github.com/Semantical/Dated.git
Running build ...
bash -c docker run --pull=always --rm -v "checkouts-4606859-2":/host -w "$PWD" registry.gitlab.com/finestructure/spi-images:wasm-6.2-latest swift build --swift-sdk wasm32-unknown-wasi 2>&1
wasm-6.2-latest: Pulling from finestructure/spi-images
Digest: sha256:44384f43f933eaa0f42803e9ef7c3d8388c5841ccc831a15a5edf63d8c273423
Status: Image is up to date for registry.gitlab.com/finestructure/spi-images:wasm-6.2-latest
Building for debugging...
[0/2] Write sources
[1/2] Write swift-version-24593BA9C3E375BF.txt
[3/11] Compiling Dated Day.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[4/12] Compiling Dated Week.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[5/12] Compiling Dated Month.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[6/12] Compiling Dated Year.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
error: emit-module command failed with exit code 1 (use -v to see invocation)
[7/12] Emitting module Dated
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[8/12] Compiling Dated LocalDate.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[9/12] Compiling Dated TimeDifference.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[10/12] Compiling Dated CalendarSubdivision.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[11/12] Compiling Dated CalendarDate.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
[12/12] Compiling Dated CalendarDateInterval.swift
/host/spi-builder-workspace/Sources/Dated/Calendar Date/CalendarDate.swift:4:8: error: no such module 'Foundation'
  2 | // Licensed under the MIT License. See LICENSE file.
  3 |
  4 | import Foundation
    |        `- error: no such module 'Foundation'
  5 |
  6 | /// A point in time relative to the current calendar.
BUILD FAILURE 6.2 wasm